Skip to main content

Clark Electric New Line Install and Removal

Clark Electric Cooperative proposes to install approximately 680 feet of 7.2 KV buried cable inside conduit. Clark Electric Cooperative also proposes to remove 2,700 feet (7.2KV) overhead line within a 40 foot wide ROW located west of highway ROW.

Project Summary

Last Updated: 10/22/2020