2025 Rangeline Culvert Replacement
The existing twin 3ft round culverts passing flow from range line creek under FR 3256 Range Line Lake Road are rusted through, heaving, and at risk of failure. The proposed action is to replace the culverts with a 81"X59" pipe arch culvert.
Project Summary
Current Status:
Completed
Location Summary:
Located on Forest Road 3256, Range Line Lake Road approximately 0.7 miles southwest of the town of Wabeno, WI.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 11/06/2024 |
| Decision | 09/2025 (Estimated) |
| Implementation | 10/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lakewood-Laona Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management
Project Activity:
Watershed Improvements
Project Decision Information
2025 Rangeline Culvert Replacement
Decision Signed Date: 09/24/2025
Forests:
Chequamegon / Nicolet National Forest
Districts:
Lakewood-Laona Ranger District
States:
Wisconsin
Counties:
Forest
Legal Land Description:
SW/SW, Sec. 18, T34N, R15E
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jennifer Maziasz
15085 State Road 32
Lakewood, WI 54138
715-209-1470
jennifer.maziasz@usda.gov
Last Updated: 9/24/2025