Special Use Permit Jump River Cooperative Electrical Lines Above Ground to Below Ground and Removal
Install new underground cable within aboveground right-of-way of Upper A Road ending at an existing junction box on Landing Camp Road to increase reliability and reduce wildfire risk. Removal of section of electrical line in another area.
Project Summary
Current Status:
Completed
Location Summary:
Lost Land Lake Area
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 06/09/2025 |
| Decision | 06/2025 (Estimated) |
| Implementation | 06/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Chequamegon / Nicolet National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Project Decision Information
Special Use Permit Jump River Cooperative Electrical Lines Above Ground to Below Ground and Removal
Decision Signed Date: 06/26/2025
Forests:
Chequamegon / Nicolet National Forest
Districts:
Great Divide Ranger District
States:
Wisconsin
Counties:
Sawyer
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Casey Swanson
500 Hanson Lake Road
Rhinelander, WI 54501
715-362-1326
Casey.Swanson@usda.gov
Last Updated: 6/30/2025