Skip to main content

Milton Seaman Reservoir Gate Rehabilitation

The City of Greeley is required by the Colorado State Engineer’s Office to take proactive steps to repair or replace the Milton Seaman Reservoir (MSR) outlet gates, which have been in continuous service since the reservoir was constructed in the 1940s.

Project Summary

Last Updated: 6/30/2026