Western Area Power Administration Blue Ridge Upgrades
This is a line upgrade with the purpose of upgrading the WAPA-owned 2.5 mile 2.4 kV distribution power line, which provides power to Blue Ridge. The upgrade will replace deteriorating poles and bring the lines to industry standards.
Project Summary
Location Summary:
At the terminus of road 200.1A; T.1 S., R.79 W., Section 31, 6th Principal Meridian
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/11/2024 |
Decision | 04/2024 (Estimated) |
Implementation | 05/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Sulphur Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Arapaho and Roosevelt National Forests
Districts:
Sulphur Ranger District
States:
Colorado
Counties:
Grand
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Ashley Philbeck
9 Ten Mile Drive
Granby, CO 80446
303-567-3006
Ashley.Philbeck@usda.gov
Last Updated: 2/4/2025