BSA - Camp Fleischmann Water System Special Use Permit
Issue 20 year authorization with established expiration date to provide water to Boy Scout of America Camp Fleischmann and include existing features. Cost Recovery.
Project Summary
Location Summary:
Camp Fleischmann Boy Scout Camp water development at unnamed spring outside of Camp permit area.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/07/2010 |
| Decision | 08/2010 (Estimated) |
| Implementation | 05/2011 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Almanor Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
BSA-Camp Fleischmann Water System Special Use Permit
Decision Signed Date: 08/31/2010
Forests:
Lassen National Forest
Districts:
Almanor Ranger District
States:
California
Counties:
Plumas
Legal Land Description:
T29N, R6E, sec. 11 N1/2 MDM (unnamed spring location); T29N, R6E, secs. 10 & 11 (water lines)
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jane Goodwin
900 E. Hwy 36
Chester, CA 96020
530-258-2141
jmgoodwin@fs.fed.us
Last Updated: 9/28/2010