Rock Creek Crossing Access Route Project
The project consists of seismic modifications to the Pit 3 Tunnel Rock Creek Crossing structure. Five support frames and their footings will be retrofitted so that the structure can withstand earthquakes without significant structure damage.
Project Summary
Location Summary:
Pit River Canyon Road (37N60Y), Rock Creek Crossing Road (37N60YA), Rock Creek Crossing.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/18/2013 |
| Decision | 10/2013 (Estimated) |
| Implementation | 02/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hat Creek Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Hydropower; Special Use Authorizations; Road Improvements/Construction
Current Status:
Cancelled
Forests:
Lassen National Forest
Districts:
Hat Creek Ranger District
States:
California
Counties:
Shasta
Legal Land Description:
T36N, R2E, Section 1.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Tristan Leong
43225 E. Hwy. 299
Fall River Mills, CA 96028
530-226-2308
tleong@fs.fed.us
Last Updated: 8/19/2013