McKenzie Meadow Restoration Project
The goal of this project is to enhance meadow habitat by re-connecting the stream to a multiple channel system and increasing stream base elevation.
Project Summary
Location Summary:
Project area is approximately 26 miles NW of Susanville, CA. It encompasses 61 miles, between McKenzie Cow Camp and Highway 44, where lowest downstream perennial portion of Pine Creek flows.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/17/2019 |
Decision | 04/2020 (Estimated) |
Implementation | 06/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Eagle Lake Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management
Project Activity:
Species Habitat Improvements; Watershed Improvements
Current Status:
Completed
Project Decision Information
McKenzie Meadow Restoration Project
Decision Signed Date: 04/03/2020
Forests:
Lassen National Forest
Districts:
Eagle Lake Ranger District
States:
California
Counties:
Lassen
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Bobette Jones
477-050 Eagle Lake Road
Susanville, CA 96130
530-257-4188
bobettejones@fs.fed.us
Last Updated: 4/3/2020