Hat Creek-Westwood PG&E Powerline Clearance

Project would remove hazardous fuels on the PG&E Hat Creek#1-Westwood 60kV Powerline. Vegetation would be cleared 40 ft out from centerline on both sides of the line and thinned 160 ft beyond that. Total width 400 ft, total length approx. 42 miles.

Project Summary

Last Updated: 7/7/2025