Skip to main content

Braden Mine Lode #2

Authorize sampling of lode deposits by excavation of horizontal tunnel into bedrock (mining adit) and processing of ore on the Braden Mine Lode #2. Amount of processed ore < or = 200 cubic yards. Total area of disturbance < or = 1 acre.

Project Summary

Last Updated: 6/28/2011