Summit Creek Culvert Replacement #1
Installation of an embedded corrugated metal pipe (CMP) at an existing low water crossing on Summit Creek at Summit Creek Road. The project will improve water quality, reduce mobilization of sediments, and improve access for residents.
Project Summary
Location Summary:
The project is located at the Summit Creek Road crossing of Summit Creek at post mile 4.0. The area is 1.5 miles South of the junctions with State Highway 3, near Hayfork Summit.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 06/13/2012 |
| Decision | 08/2013 (Estimated) |
| Implementation | 09/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (7), 36 Cfr 220.6(E)(7)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hayfork Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management; Wildlife, Fish, Rare Plants
Project Activity:
Species Habitat Improvements; Watershed Improvements
Current Status:
Cancelled
Forests:
Shasta Trinity National Forest
Districts:
Hayfork Ranger District
States:
California
Counties:
Trinity
Legal Land Description:
The site is located inTownship 32N Range 10W in the NW ¼ of Section 32 MDM.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Shalonda Guy
P.O. Box 159
Hayfork, CA 96041
530-628-1243
shalondalguy@fs.fed.us
Last Updated: 6/29/2014