Skip to main content

CEC Suttle Lake Line Re-alignment

Central Electric Cooperative Inc. is proposing to install16 vaults and replace/relocate 2.1 miles of an existing direct buried distribution power line located in a southeasterly direction from Suttle Lake Road (USFS 2070

Project Summary

Last Updated: 8/17/2016