Forest Service Road 3120 Flood Repair and Meadow Restoration
Repair road damage at milepost 4.0 resulting from the May 2011 flood, by replacing a failed pipe with multiple pipes, and using heavy equipment to reduce channel definition on both sides of the road and spread water across the meadow.
Project Summary
Location Summary:
Headwaters of Frost Creek in the Taneum Creek watershed.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 12/20/2011 |
Comment Period | 06/16/2012 |
Decision | 09/2012 (Estimated) |
Implementation | 10/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (6), 36 Cfr 220.6(E)(6)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Cle Elum Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Road Management
Project Activity:
Road Maintenance; Road Improvements/Construction
Current Status:
Completed
Project Decision Information
Categorical Exclusion Forest Service Road 3120 Mile Post 4.0 Flood Repair
Decision Signed Date: 09/06/2012
Legal Notice Date: 09/07/2012
Forests:
Okanogan-Wenatchee National Forest
Districts:
Cle Elum Ranger District
States:
Washington
Counties:
Kittitas
Legal Land Description:
Section 10, Township 18 North, Range 15 East, W.M.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Michelle King
803 W. 2nd Street
Cle Elum, WA 98922
509-653-1420
mdking02@fs.fed.us
Last Updated: 9/10/2012