Pacific Connector Site Study and Survey Special Use Permit Renewal
Renew existing special use permit to facilitate continued study/analysis on proposed Pacific Connector Gas Pipeline right-of-way. No new improvements outside existing survey areas are authorized with permit renewal.
Project Summary
Location Summary:
Pacific Connector Gas Pipeline right-of-way
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/12/2017 |
Decision | 03/2017 (Estimated) |
Implementation | 03/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Tiller Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
SUP Renewal Site Survey and Testing Pacific Connector Gas Pipeline
Decision Signed Date: 03/15/2017
Forests:
Fremont-Winema National Forest; Rogue River-Siskiyou National Forest; Umpqua National Forest
Districts:
Klamath Ranger District; High Cascades Ranger District; Tiller Ranger District
States:
Oregon
Counties:
Douglas; Jackson; Klamath
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
David Krantz
27812 Tiller Trail Highway
Tiller, OR 97484
541-618-2126
dkrantz@fs.fed.us
Last Updated: 3/16/2017