Alger Delta Permit Amendment
Permit Amendment to authorize installing a buried cable at a depth of 48 inches within a permitted road to provide power to existing structures on private land. The action would begin at an existing permitted power pole and extend about 600 feet.
Project Summary
Current Status:
Completed
Location Summary:
T 45 N, R 19 W, Section 28
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 07/26/2013 |
| Decision | 02/2014 (Estimated) |
| Implementation | 02/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hiawatha National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Project Decision Information
Alger Delta Permit Amendment
Decision Signed Date: 02/03/2014
Legal Notice Date: 02/05/2014
Forests:
Hiawatha National Forest
Districts:
Munising Ranger District
States:
Michigan
Counties:
Alger
Legal Land Description:
Township 45 N, Range 19 W, Section 28
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Brenda Rebitzke
820 Rains Drive
Gladstone, MI 49829
906-474-6442
brebitzke@fs.fed.us
Last Updated: 3/27/2014