Enbridge Integrity Dig MP 1369.9115
The pipeline site will be excavated, inspected, and repaired as needed. The excavation will be approximately 60-80 feet long, 30-40 feet wide, and up to 10 feet deep. Repair may consist of welding a metal sleeve around and recoating the pipeline
Project Summary
Current Status:
Completed
Location Summary:
NE 1/4 T41N R19W S20
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/29/2014 |
| Decision | 01/2015 (Estimated) |
| Implementation | 02/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Rapid River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Enbridge Integrity Dig MP 1369.9115
Decision Signed Date: 01/16/2015
Forests:
Hiawatha National Forest
Districts:
Rapid River Ranger District
States:
Michigan
Counties:
Delta
Legal Land Description:
NE 1/4 T41N R19W, S20
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Scott Maki
8181 US Highway 2
Rapid River, MI 49878
906-474-6442 x134
smaki@fs.fed.us
Last Updated: 2/27/2015