Enbridge 1359 Site and Road Construction
Within existing corridor, Enbridge Energy LP proposes to exacavate section of pipeline to install emergency flow restriction device, install valve control building and communication pole with gravel and fence around, and construct gravel access road.
Project Summary
Current Status:
Completed
Location Summary:
Northeast of Rapid River, Michigan, on the east side of County Road 509
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/15/2014 |
| Decision | 06/2015 (Estimated) |
| Implementation | 07/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hiawatha National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations; Oil
Project Decision Information
Enbridge 1359 Site and Road Construction
Decision Signed Date: 06/30/2015
Forests:
Hiawatha National Forest
Districts:
Rapid River Ranger District; Manistique Ranger District
States:
Michigan
Counties:
Delta
Legal Land Description:
T 41 N, R 21 W, SE 1/4 of SE 1/4 of Section 15
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Scott Maki
820 Rains Drive
Gladstone, MI 49829
906-474-6442 x134
smaki@fs.fed.us
Last Updated: 7/5/2015