Upper Peninsula Power Company Underground Electric Cable Installation
Install over 10000 feet of underground electric cable to power the Enbridge 1359 Site. Install 4 junction enclosures and one transformer.
Project Summary
Current Status:
Completed
Location Summary:
In the right-of-way on the west of County 509 Y Road, from 26.6 Road north to the Enbridge pipeline, then east along the south edge of the pipeline easement for approximately 200 feet.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/29/2014 |
| Decision | 12/2014 (Estimated) |
| Implementation | 04/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hiawatha National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Project Decision Information
Upper Peninsula Power Company Underground Electric Cable Installation
Decision Signed Date: 12/05/2014
Forests:
Hiawatha National Forest
Districts:
Rapid River Ranger District; Manistique Ranger District
States:
Michigan
Counties:
Delta
Legal Land Description:
T 41 N, R 21 W, Sections 15, 22, and 27.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Brenda Rebitzke
820 Rains Drive
Gladstone, MI 49829
906-474-6442
brebitzke@fs.fed.us
Last Updated: 12/10/2014