Cloverland Project 202
This project proposes adding a new line to the existing master special use permit, that will connect two critical substations allowing broader backup coverage of powered service when emergencies or line outages arise across currently isolated circuit
Project Summary
Location Summary:
create a create a circuit tie between Trout Lake and Eckerman substations. Installation will consist of approximately three miles of 3%u0278 #350MCM concentric line in a 6" HDPE conduit.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/05/2025 |
Decision | 05/2025 (Estimated) |
Implementation | 05/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Sault Ste. Marie Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Facility Improvements/Construction; Special Use Authorizations
Current Status:
In Progress
Forests:
Hiawatha National Forest
Districts:
Sault Ste. Marie Ranger District
States:
Michigan
Counties:
Chippewa
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Rita Morris
W1900 West US-2
St. Ignace, MI 49781
000-000-0000
rita.morris@usda.gov
Last Updated: 5/9/2025