Skip to main content

Hiawatha Telephone Co. Hwy 94 Fiber Optic Cable

Install 11 miles of underground fiber optic cable within the right-of-way of Hwy 94, from Shingleton south to County Road 437. Construction methods would include vibratory and static plowing, directional boring, and aerial.

Project Summary

Last Updated: 8/27/2012