Michigan Department Of Transportation Ogontz River Bridge Replacement
Michigan Department of Transportation (MDOT) to install a temporary road and bridge for US Highway 2 traffic, while replacing the existing bridge on Highway 2 crossing the Ogontz River. ** NEPA analysis completed by MDOT. Action will proceed. **
Project Summary
Location Summary:
The project area is approximately 8 miles east of Rapid River, Michigan, at US Highway 2 and the Ogontz River.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/2015 (Estimated) |
Decision | 06/2015 (Estimated) |
Implementation | 06/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hiawatha National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Hiawatha National Forest
Districts:
Rapid River Ranger District; Manistique Ranger District
States:
Michigan
Counties:
Delta
Legal Land Description:
T 41 N, R 20 W, Section 34
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Brenda Rebitzke
820 Rains Drive
Gladstone, MI 49829
906-474-6442
brebitzke@fs.fed.us
Last Updated: 6/30/2015