East Zone Enbridge Integrity Dig
Enbridge is proposing an integrity dig to inspect their pipeline within the East Zone of the Hiawatha National Forest.
Project Summary
Location Summary:
within the existing pipeline corridor southeast of Cheeseman Road.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/27/2016 |
Decision | 01/2017 (Estimated) |
Implementation | 02/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
St. Ignace Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Hiawatha National Forest
Districts:
St. Ignace Ranger District
States:
Michigan
Counties:
Mackinac
Legal Land Description:
T40N R4W Sections 3 and 4
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Karina Hawley
W1900 US 2
St. Ignace, MI 49781
906-428-5833
khawley@fs.fed.us
Last Updated: 1/23/2017