Skip to main content

Antelope Valley Station to Neset Transmission Project

Basin Electric Power Cooperative proposes a 345-kV transmission line connecting the existing AVS, Charlie Creek, Williston and Neset substations and the newly proposed Judson and Tande substations. Part of the line crosses the McKenzie RD.

Project Summary

Last Updated: 9/11/2015