Skip to main content

Whiting Oil and Gas BSMU 2501, Water Injection Line Replacement

Proposal to replace deteriorating steel line with approximately 3800 ft. of new 3 inch high pressure fiberglass pipe.

Project Summary

Last Updated: 6/27/2014