Skip to main content

Whiting Oil and Gas BSMU 3001 Flowline Replacement

Proposal to replace deteriorating steel line with approximately 3,600 ft. of new 3 inch high pressure fiberglass pipe.

Project Summary

Last Updated: 7/1/2014