Bridger Pipeline Special-use Application
Install approximately 3,650 feet of 16-inch steel crude pipeline on National Forest System land in sections 33 and 34 of T140N, R100W.
Project Summary
Location Summary:
Entire pipeline project would be approximately 15 miles long, on public and private lands, in Billings County
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/02/2015 |
Decision | 07/2015 (Estimated) |
Implementation | 07/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Medora Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management; Minerals And Geology
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Bridger Pipeline LLC Pipeline Construction, Billings County
Decision Signed Date: 07/02/2015
Forests:
Dakota Prairie Grasslands
Districts:
Medora Ranger District
States:
North Dakota
Counties:
Billings
Legal Land Description:
Sections 33 and 34 of T140N, R100W
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Cathy Walsh
99 23rd Avenue W, Suite B
Dickinson, ND 58601-3135
701-227-7818
cewalsh@fs.fed.us
Last Updated: 7/9/2015