McKenzie Electric Cooperative, Inc. Silurian 9-1 and 18-1 Electrical System

McKenzie Electric Cooperative, Inc. proposes to install approximately 5433 feet of three-phase, buried electric cable with associated above ground structures along NFSRs 883-1 and 885 to service Silurian's 9-1 and 18-1 locations.

Project Summary