McKenzie Electric Cooperative, Inc. Silurian 9-1 and 18-1 Electrical System
McKenzie Electric Cooperative, Inc. proposes to install approximately 5433 feet of three-phase, buried electric cable with associated above ground structures along NFSRs 883-1 and 885 to service Silurian's 9-1 and 18-1 locations.
Project Summary
Location Summary:
T153N, R95W, Section 10, 5th PM along NFSRs 883-1 and 885
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 10/04/2017 |
Decision | 12/2017 (Estimated) |
Implementation | 03/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Dakota Prairie Grasslands All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
McKenzie Electric Cooperative, Inc. Silurian 9-1 and 18-1 Electrical System
Decision Signed Date: 12/17/2017
Forests:
Dakota Prairie Grasslands
Districts:
Mckenzie Ranger District
States:
North Dakota
Counties:
McKenzie
Legal Land Description:
T153N, R95W, Section 10, 5th PM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Dustin Beaty
2000 Miriam Circle
Bismarck, ND 58501
701-842-8513
dustinlbeaty@fs.fed.us
Last Updated: 12/10/2019