Prairie Federal Utility Route
XTO Energy, Inc proposes to construct crude oil and natural gas pipeline systems to transport oil and gas from the Prairie Federal well pad to existing pipeline gathering systems.
Project Summary
Location Summary:
Sections 19, 20, and 30, T149N, R96W; Section 24, T149N, R97W
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/01/2020 |
Comment Period | 06/01/2020 |
Objection Period Start | 04/20/2021 |
Decision | 06/2021 (Estimated) |
Implementation | 06/2021 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mckenzie Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Prairie Federal Utility Route
Decision Signed Date: 06/14/2021
Forests:
Dakota Prairie Grasslands
Districts:
Mckenzie Ranger District
States:
North Dakota
Counties:
McKenzie
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kim Grotte
1905 Main St. South
Watford City, ND 58854-6705
701-842-8509
kim.grotte@usda.gov
Last Updated: 6/14/2021