Skip to main content

McKenzie Electric Cooperative Hartman/Trotter/Carson Project

MEC is proposing to build the single-phase underground power line. It would be energized to 14.4 kV and be approximately 5,710 feet in length. MEC would be granted a 20-foot Right of Way (2.6 acres)for construction, operations, and maintenance.

Project Summary

Last Updated: 11/3/2021