Roughrider Electric Cooperative, Inc. Connection Line- 33 Feet
Roughrider Electric Cooperative, Inc proposes to install 33 feet of buried electric line to connect to an existing meter pole to power a range water well.
Project Summary
Location Summary:
Section 17, T140N, R102W, Billings County, North Dakota
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/08/2023 |
Decision | 12/2023 (Estimated) |
Implementation | 01/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Medora Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Roughrider Electric Cooperative, Inc. Connection Line- 33 Feet
Decision Signed Date: 12/27/2023
Forests:
Dakota Prairie Grasslands
Districts:
Medora Ranger District
States:
North Dakota
Counties:
Billings
Legal Land Description:
Section 17, T140N, R102W, Billings County, North Dakota
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Cathy Walsh
99 23rd Avenue W, Suite B
Dickinson, ND 58601-3135
701-264-7871 x142
cathleen.walsh@usda.gov
Last Updated: 1/11/2024