Skip to main content

Scout Energy Management, LLC MHMU 06 Oil Well Reentry

Reentry of the existing well bore to drill one horizontal oil and gas well on the existing pad with a 972 ft. flow line installation.

Project Summary

Last Updated: 7/23/2024