Roughrider Electric Cooperative, Inc. Underground Power Cables
Roughrider Electric has WITHDRAWN/CANCELLED the project. The consumer decided to cancel the project as it was initially proposed and will be feeding power from outside NFS Lands.
Project Summary
Location Summary:
T138 R100W, Section 4
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/10/2024 |
Decision | 02/2025 (Estimated) |
Implementation | 04/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Medora Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission
Current Status:
Cancelled
Forests:
Dakota Prairie Grasslands
Districts:
Medora Ranger District
States:
North Dakota
Counties:
Billings
Legal Land Description:
T138 R100W, Section 4
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Ian Barr
99 23rd Avenue W, Suite B
Dickinson, ND 58601-3135
701-227-7800
Ian.Barr@usda.gov
Last Updated: 2/4/2025