High West Energy Mead Well Electrification
The Forest Service proposes to authorize a single phase overhead 7.2kv electrical power distribution line and a10 ft. right-of-way for the power line.
Project Summary
Location Summary:
Along WCR 104 west of WCR 57 for approximately 1.1 miles
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 05/03/2012 |
| Comment Period | 05/03/2012 |
| Decision | 07/2012 (Estimated) |
| Implementation | 07/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pawnee Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission
Current Status:
Completed
Project Decision Information
Decision Memo - Issue an Amendment to an Existing Special Use Permit
Decision Signed Date: 07/10/2012
Legal Notice Date: 07/26/2012
Forests:
Arapaho and Roosevelt National Forests
Districts:
Pawnee Ranger District
States:
Colorado
Counties:
Weld
Legal Land Description:
T. 9 N., R. 64 W., 6th P.M., sec. 23, S2S2; sec. 24, SWSW.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Vernon Koehler
P.O. Box 386
Ault , CO 80610
970-346-5005
vkoehler@fs.fed.us
Last Updated: 9/25/2012