Ratville Floodplain Connectivity Project
The Forest Service proposes to improve water quality and floodplain connectivity following the 2020 Cameron Peak Fire on this unnamed tributary to the South Fork of the Cache la Poudre River.
Project Summary
Location Summary:
The proposed project is located on an unnamed tributary to the South Fork
Cache la Poudre River along NFSR 350 in an area referred to as both
Ratville and Monument Gulch.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 02/15/2023 |
| Decision | 05/2023 (Estimated) |
| Implementation | 08/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Canyon Lakes Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management
Project Activity:
Watershed Improvements
Current Status:
Completed
Project Decision Information
Ratville Floodplain Connectivity Project
Decision Signed Date: 05/30/2023
Forests:
Arapaho and Roosevelt National Forests
Districts:
Canyon Lakes Ranger District
States:
Colorado
Counties:
Larimer
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Sarah Beck
2150 Centre Avenue, Building E
Fort Collins, CO 80526
000-000-0000
Sarah.Beck@usda.gov
Last Updated: 6/14/2023