Denver Water Gross Reservoir Exploratory Drilling
Denver Water wants to conduct exploratory drilling on National Forest System (NFS) land adjoining Osprey Point Quarry to determine if expanding the current Osprey Point Quarry onto NFS land is a viable option.
Project Summary
Location Summary:
An area west adjoining to the existing Osprey Point Quarry and assessable via Osprey Point Road; Township 1S., Range 71W., Section 30, 6th Principal Meridian.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 10/19/2023 |
| Decision | 04/2024 (Estimated) |
| Implementation | 04/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Boulder Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Denver Water Exploratory Drilling at Gross Reservoir
Decision Signed Date: 04/23/2024
Forests:
Arapaho and Roosevelt National Forests
Districts:
Boulder Ranger District
States:
Colorado
Counties:
Boulder
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
2140 Yarmouth Avenue
Boulder, CO 80301
303-541-2534
Lauren.Kryszczuk@usda.gov
Last Updated: 9/26/2024