Exploratory Core Drilling - Coconino and Kaibab Material Site Investigations
Drilling of 6-8 inch diameter holes at 5 locations to determine the geologic make-up of the site for potential use as a rock pit. Includes using a truck-mounted auger to drill one or possibly two holes per location, then backfilling the excavation.
Project Summary
Location Summary:
See map of 5 drilling locations.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/05/2011 |
Decision | 07/2011 (Estimated) |
Implementation | 07/2011 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Coconino National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Road Maintenance
Current Status:
Completed
Project Decision Information
Rock Pit Exploratory Drilling
Decision Signed Date: 07/07/2011
Forests:
Coconino National Forest; Kaibab National Forest
Districts:
Mogollon Rim Ranger District; Flagstaff Ranger District; Williams Ranger District; Tusayan Ranger District
States:
Arizona
Counties:
Coconino
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Mike Dechter
1824 S. Thompson St.
Flagstaff, AZ 86001
928-527-3416
mdechter@fs.fed.us
Last Updated: 7/7/2011