Yavapai Apache Sewer and Utility Line Project
Proposal to construct a buried utility line (sewer and likely natural gas) along Middle Verde and Reservation Loop Road in the Camp Verde, Arizona area.
Project Summary
Location Summary:
Approximately 6 feet from the edge of pavement along Middle Verde Road from near Interstate 17 to Reservation Loop Road and into non-federal land.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/26/2013 |
Comment Period | 08/31/2013 |
Decision | 12/2013 (Estimated) |
Implementation | 02/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Red Rock Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Yavapai Apache Sewer and Utility Line Project
Decision Signed Date: 12/12/2013
Legal Notice Date: 12/24/2013
Forests:
Coconino National Forest
Districts:
Red Rock Ranger District
States:
Arizona
Counties:
Yavapai
Legal Land Description:
Section7,Township 14 North, Range 5 East and Section 12, Township 14 North Range 4 east, G&SRM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public