Skip to main content

St. Joseph's Youth Camp Wastewater System Replacement Project

This project would allow for up to 12 test pits ( 3 pits at 4 sites)to be excavated to determine soil suitability in order to identify the location of a new leach field for a new septic system and replacement of the existing system.

Project Summary

Last Updated: 11/20/2015