St. Joseph's Youth Camp Wastewater System Replacement Project
This project would allow for up to 12 test pits ( 3 pits at 4 sites)to be excavated to determine soil suitability in order to identify the location of a new leach field for a new septic system and replacement of the existing system.
Project Summary
Location Summary:
St Joseph's Youth Camp is located at 4860 Mormon Lake Rd. Mormon Lake, AZ 86038
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/13/2015 |
Decision | 11/2015 (Estimated) |
Implementation | 12/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (8), 36 Cfr 220.6(D)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Flagstaff Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management; Special Use Management
Project Activity:
Dispersed Recreation Mgmt.
Current Status:
Completed
Project Decision Information
St. Joseph's Youth Camp Wastewater System Replacement Project
Decision Signed Date: 11/20/2015
Forests:
Coconino National Forest
Districts:
Flagstaff Ranger District
States:
Arizona
Counties:
Coconino
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jessica Richardson
5075 N. Highway 89
Flagstaff, AZ 86005
928-527-8288
jessicalrichardson@fs.fed.us
Last Updated: 11/20/2015