Skip to main content

AZ Public Service Mt Elden Distribution Line Rebuild

APS is proposing to rebuild portions of the distribution line that failed in 2015 from severe weather. The new proposal is designed to withstand locally severe winter weather conditions. All the ground disturbing activities restricted to the ROW.

Project Summary

Last Updated: 9/19/2017