Skip to main content

Wickiup Creek Flow Restoration

Restoration of Wickiup Creek is needed to re-establish a surface flow channel through excavation of accumulated sediment and the addition of grade controls to maintain a stable, alluvial channel through the reach of Wickiup draw.

Project Summary

Last Updated: 1/12/2021