Cave Springs Streambank Stabilization
Stabilize a portion of the Cave Springs streambank along Oak Creek by replacing a grouted rip-rap structure with a stepped, concrete wall. Project to also stabilize a low-water crossing along the Cave Springs Campground access road.
Project Summary
Location Summary:
Section 34, T 19N, R 6E
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/25/2020 |
Decision | 03/2023 (Estimated) |
Implementation | 05/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Red Rock Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management
Project Activity:
Species Habitat Improvements; Road Maintenance; Road Improvements/Construction
Current Status:
Completed
Project Decision Information
Cave Springs Streambank Stabilization
Decision Signed Date: 03/24/2023
Forests:
Coconino National Forest
Districts:
Red Rock Ranger District
States:
Arizona
Counties:
Coconino
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Elizabeth Munding
8375 State Route 179
Sedona, AZ 86351
928-203-2914
elizabeth.a.munding@usda.gov
Last Updated: 5/8/2023