Lumen Fiber Optic Installation Along Highway 180
Install fiber optic cable on an existing APS power line between Magdalena Road and the Basecamp at Snowbowl.
Project Summary
Location Summary:
Located along Highway 180 between Magdalena Road and the Snowbowl Basecamp at the bottom of Forest Road 516.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/14/2022 |
Decision | 08/2022 (Estimated) |
Implementation | 09/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Coconino National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Snowbowl Fiber Reinforcement Project (Centurylink Project N.804226)
Decision Signed Date: 08/24/2022
Forests:
Coconino National Forest
Districts:
Flagstaff Ranger District
States:
Arizona
Counties:
Coconino
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Mike Dechter
1824 S. Thompson St.
Flagstaff, AZ 86001
928-527-3416
Michael.Dechter@usda.gov
Last Updated: 9/6/2022