Skip to main content

74 Draw Channel Restoration Project

Use hand tools and heavy equipment to implement low-tech restoration techniques (Zuni bowl, one-rock grade control structures, plantings) to stabilize 0.7 mile of ephemeral stream channel, floodplain, wet meadow, and Forest Road 226. Replace a spring box, and fell 20 ponderosa pine for log sills.

Project Summary

Last Updated: 5/28/2026