Skip to main content

Realignment of WNMTC Fiber Optic Telephone Cable along NMSH #12 at SU Canyon, west of Reserve, NM

Due to a replacement construction project of the NMSH #12 bridge #3446 which crosses SU Canyon, the existing WNMTC fiber optic cable, which is currently located on the bridge needs to be moved out of the area of construction.

Project Summary

Last Updated: 12/18/2012