Skip to main content

PG&E Drum-Rio Oso Transmission Reliability Project

The project involves reliability improvements and consolidation of the parallel Drum Rio Oso #1 and #2 115kV electric transmission lines. Electric conductor and support structures will be replaced.

Project Summary

Last Updated: 6/30/2021