Mosquito Grazing Allotment
To determine if the existing condition is meeting or heading towards the desired condition in the Forest Plan, if it is not, to analize management practices that will move the allotment towards desired condition through the interdisciplinary process.
Project Summary
Location Summary:
East of Foresthill between Big Oak Flat and Duncan Peak.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/18/2015 |
Comment Period | 03/25/2016 |
Objection Period Start | 06/12/2016 |
Decision | 09/2016 (Estimated) |
Implementation | 10/2016 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Grazing, Rescissions Act Of 1995
Lead Management Unit:
American River Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Grazing Management
Project Activity:
Grazing Allotment Management
Current Status:
Completed
Project Decision Information
Mosquito Grazing Allotment
Decision Signed Date: 09/30/2016
Forests:
Tahoe National Forest
Districts:
American River Ranger District
States:
California
Counties:
Placer
Legal Land Description:
Sections 14, 15, 22-29, and 32-36 T15N, R12E; Sections 29-33 T15N, R13E; Section 15, T14N R11E, Sections 1-4, 8-30 T14N, R12E; Sections 4-9, 16-20, 29, 30 T14N, R13E.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Leigh Sevy
22830 Foresthill Road
Foresthill, CA 95631
530-478-6227
lsevy@fs.fed.us
Last Updated: 10/3/2016