Skip to main content

Big Chief Trail Project

Construct non-motorized trail from existing Sawtooth Loop Trail to Watson Lake Trail/Tahoe Rim Trail as non-motorized multiple use trail, designed and managed for mountain bike use. The trail length on NFS land aprox 6.6 mi.

Project Summary

Last Updated: 1/24/2018