T-Mobile/PacBell Cisco Buttes Generator/Concrete Pad Install (NCD40121)
New concrete pad and generator need within existing lease site. A new power conduit will run underground from the generator to a new automatic transfer switch that will be mounted to the exterior of the existing equipment shelter.
Project Summary
Location Summary:
Cisco Buttes, Placer County, CA
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/22/2022 |
Decision | 03/2023 (Estimated) |
Implementation | 03/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
American River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Facility Improvements/Construction; Special Use Authorizations
Current Status:
Completed
Project Decision Information
T-Mobile/PacBell Cisco Buttes Generator/Concrete Pad Install (NCD40121)
Decision Signed Date: 03/09/2023
Forests:
Tahoe National Forest
Districts:
American River Ranger District
States:
California
Counties:
Placer
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Matthew Brownlee
22830 Foresthill Road
Foresthill, CA 95631
530-478-6254
matthew.brownlee2@usda.gov
Last Updated: 3/9/2023