Basin Electric Power Cooperative Gap Substation Expansion

The project consists of constructing two 17.4 MVAR capacitor banks on a roughly rectangular parcel immediately adjacent to the existing Gap Substation. The area permitted for the substation addition is approximately 4.40 acres.

Project Summary