Basin Electric Power Cooperative Gap Substation Expansion
The project consists of constructing two 17.4 MVAR capacitor banks on a roughly rectangular parcel immediately adjacent to the existing Gap Substation. The area permitted for the substation addition is approximately 4.40 acres.
Project Summary
Location Summary:
Section 20, T147N, R103W, 5th PM, McKenzie County, North Dakota
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/14/2012 |
| Decision | 07/2014 (Estimated) |
| Implementation | 10/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mckenzie Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Basin Electric Power Cooperative Gap Substation Expansion
Decision Signed Date: 07/08/2014
Forests:
Dakota Prairie Grasslands
Districts:
Mckenzie Ranger District
States:
North Dakota
Counties:
McKenzie
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jeff Ingalls
1905 Main St. South
Watford City, ND 58854-6705
701-842-2393
jingalls@fs.fed.us