Skip to main content

Petro-Hunt, LLC CMNU D-406 Flowline Replacement

Replacement of an aged steel existing flowline carrying Federal minerals from a producing oil and gas well to a central tank battery. The existing line will be replaced with a 3" spooled fiberglass line.

Project Summary

Last Updated: 12/3/2013